Second Storey Additions | Zaatini Group

Construct / Second Storey Additions

Second Storey Additions in Western Sydney

Create the extra bedrooms, living space and privacy your family needs - without sacrificing your backyard or leaving the location you love.

Rated five stars Reviewed by Sydney homeowners
  • Fixed-price contracts
  • Builder Licence 497180C
  • Design & construction under one roof
Second Storey Additions | Zaatini Group

What we do

Thoughtfully designed second-story additions

At Zaatini Group, we design and build second-storey additions that give growing families the extra space they need – without requiring them to leave the home and neighbourhood they love.

Whether you need additional bedrooms, a parents’ retreat, extra bathrooms, a home office or a second living area, we’ll create an upper level that feels like a natural extension of your existing home. Every detail is carefully considered, from the exterior proportions and roofline to the flow of the new floor plan and the way natural light moves through each space.

Our experienced team manages the entire process, including design development, planning and approvals, engineering, construction and finishing. We also assess your home’s existing structure to determine the most practical way to support the new level while minimising disruption wherever possible.

The result is a beautifully integrated second-storey addition that improves your home’s functionality, appearance and long-term value.

Book a site visit

Bespoke solutions

What's included in a Zaatini renovation

Whole-home design

Both levels are considered together so the new rooms, stairs and circulation improve the way the entire house functions.

Structural assessment and engineering

The existing foundations, walls, framing and roof structure are assessed before the new level is designed and constructed.

Seamless architectural integration

Rooflines, windows, materials, proportions and facade details are carefully resolved so the upper level feels like part of one complete home.

Interior planning and finishing

Flooring, doors, lighting, joinery, bathrooms and other finishes are coordinated across the new and existing areas to create a cohesive result.

How a Zaatini addition runs

Four stages, one team

A second storey addition requires design, structural engineering, approvals and construction to progress in the correct order. Resolving each stage before the next begins provides greater cost clarity and a more coordinated build.

STAGE ONE

Site and structural assessment

We inspect the existing home, discuss the additional space you need and review the structure, access, planning controls and likely construction requirements. An initial scope and realistic budget range are established before detailed design begins.

STAGE 02

Design and approvals

The new upper level, staircase, facade and any associated ground-floor changes are developed together. Architectural documentation, engineering, certification and the relevant approvals are coordinated as the design progresses.

STAGE 03

Selections and fixed-price contract

The construction scope, structural work, materials, fixtures and finishes are documented, trade pricing is confirmed and a clear building program is prepared before work starts.

STAGE 04

Construction & handover

One site manager coordinates the build and provides regular progress updates. The addition and affected areas of the existing home are completed, inspected and handed over as one cohesive result.

Recent work

Second storey additions we have completed

Talk to us about yours

common question

Questions we get asked first

The cost depends on the size and complexity of the addition, the condition of the existing house, structural reinforcement, staircase design, bathrooms and services, approval requirements, site access and the selected materials and finishes.

Ground-floor alterations may also affect the total investment. Zaatini Group begins with a site and structural assessment, then develops the design and scope alongside a realistic budget before construction begins.

Not every home is suitable without modification. The existing foundations, load-bearing walls, framing, building condition, block, planning controls and access all need to be assessed.

Some homes can support an upper level with targeted structural work, while others may require more extensive reinforcement. This needs to be established through site investigation and engineering rather than assumed from the home’s appearance.

That is a central part of the design. Zaatini Group considers the proportions, roof forms, windows, external materials, facade details and overall streetscape appearance so the addition reads as part of one complete home.

The objective is not simply to match every existing element. It is to create a balanced architectural result in which the old and new areas feel intentionally connected.

Stair placement is one of the most important decisions in a second storey addition. It affects the layout, natural movement, privacy and usable space on both levels.

The staircase is planned at the beginning of the design process, not added after the upstairs rooms have been arranged. Where possible, it should provide a natural connection without disrupting important ground-floor living areas.

Some ground-floor work is normally required to accommodate the staircase, structural support and service connections. You may also choose to update the layout, kitchen, flooring or finishes while the major construction work is taking place.

Even if a full ground-floor renovation is not included immediately, both levels should be planned together so future improvements remain practical.

This depends on the scope of the work, construction sequence and whether essential areas such as bedrooms, bathrooms, the kitchen or utilities will remain safely accessible.

Second storey additions involve significant structural work, noise, dust and periods when the roof or parts of the existing home are opened. In many cases, alternative accommodation is the safer and more practical option. Zaatini Group can discuss this with you once the scope and building program are understood.

The overall timeframe includes investigation, design, engineering, approvals, selections and construction. It varies according to the size and complexity of the addition, structural requirements, approval pathway, ground-floor alterations, site access and weather.

Once the documentation, selections and scope are finalised, Zaatini Group provides a construction program outlining the expected sequence and milestones.

Yes. Zaatini Group can coordinate architectural documentation, structural engineering, certification and the relevant planning or building approvals as part of its design and construction service.

The appropriate approval pathway depends on the property, design and planning controls affecting the site.

That depends on the available footprint, existing structure, staircase position, planning controls and your priorities. A second storey might include bedrooms and a bathroom, a complete parents’ retreat, a children’s living zone, a study or a combination of these spaces.

The layout should provide useful rooms without compromising light, privacy, storage or circulation.

Yes. A private upper-level master suite can include a bedroom, ensuite, walk-in wardrobe and, where the site allows, a balcony or sitting area.

Its position should be considered alongside views, orientation, overlooking, roof form and the location of plumbing and structural supports.

It can if the addition is poorly planned. Window placement, stair openings, upper-level setbacks, voids and the relationship with existing rooms should all be considered to protect or improve natural light.

The aim is to ensure the new level does not make the original home feel dark or disconnected.

The existing roof is generally removed or altered in the area where the new level will be constructed. A new roof structure is then created as part of the upper-level design.

Temporary weather protection, construction sequencing and the final connection between the new structure and retained portions of the home are planned before this work begins.

Possibly. Additional bathrooms, bedrooms and living areas may require changes to plumbing, drainage, hot water, electrical capacity, heating, cooling or data services.

The existing services are reviewed during design so any necessary upgrades can be documented and allowed for before construction.

Where we build

Penrith · Jamisontown · Glenmore Park · Blacktown · Kellyville · Liverpool · Camden · Parramatta · The Hills · Campbelltown · and across Greater Western Sydney

Free consultation

Find out what your home can become

Send us the basics and a builder will call you within one business day. We'll walk the house, tell you what's structurally possible, and give you a written price range before you spend anything on drawings.

  • A real builder on the phone, not a call centre
  • Honest feasibility advice, even when the answer is no
  • Fixed price agreed before demolition day

Prefer to talk now? 0411 577 855

Request your price range

"*" indicates required fields

Phone*

No obligation. Your details stay with our build team.

Tell us about your home and we'll tell you what's possible.

Enquire Now